Hybrid Contract Work Work On Urban Network
Hybrid Contract Work Work On Urban Network
| ΗΜ ΣΥΜΒΑΣΗΣ : 7-8-2012 | |
| ΗΜ ΠΕΡΑΙΩΣΗΣ : 9-30-2013 | |
| ΠΡΟΫΠΟΛΟΓΙΣΜΟΣ : 201,173.18 € | |
| ΤΟΠΟΣ : ΠΕΡΙΦΕΡΕΙΑ ΘΡΑΚΗ | |
| ΕΡΓΟΔΟΤΗΣ : ΟΤΕ |
(Hybrid / 2 / AMG / 2012/2 – 1. (gross / 1 / FCS / 2012/1) – 2. (OLED / 1 / FCS / 2012/2) – 3. (gross / 1 / strated / 2012 / 1) – 4 (OLED / 1 / strated / 2012/2)
